St Bartholomew`s Hospital – Mechanical Validation Survey
Comprehensive Mechanical Existing Services Survey



Project Overview
We were tasked with conducting a comprehensive survey of the existing mechanical systems on the 4th and 6th floors of St Bartholomew’s Hospital, part of the Barts Health NHS Trust. The objective was to evaluate the systems in light of proposed new works, ensuring alignment with the issued tender drawings and advising on any necessary modifications.
Project Scope
Our engagement involved a meticulous review and assessment process to ensure the proposed mechanical upgrades were feasible and aligned with the hospital’s operational requirements.
We conducted a thorough on-site survey of the existing mechanical systems on the 4th and 6th floors. This involved inspecting all relevant installations, including HVAC systems, ventilation, and piping, to assess their current condition and compatibility with the proposed upgrades.
The key aspects of our survey included:
- Survey of Existing Mechanical Systems
- Review of Tender Drawings
- Reporting and Recommendations
- Advising on Alternatives
- Initial Survey and Data Collection
- Review and Analysis
- Recommendations and Alternatives
Project Outcome
The Mechanical Validation Survey at St. Bartholomew`s Hospital successfully ensured that all the mechanical systems are compliant, operating efficiently and the existing services drawings were correct. The survey identified areas for improvement, resulting in actionable recommendations for the new proposed stage 4 design and any future structural clashes that will be a concern. The comprehensive insights provided will help the hospital strategically plan for future upgrades and maintenance.
Get In Touch
Colne House Farm, Station Rd, Earls Colne, Colchester, CO6 2LT, UK
01206 326348